* The histograms used to produce these plots come from /afs/crc.nd.edu/user/f/fyan2/www/EFT/fitting_plots/postfit_2sigma/ - The ones with dec15 label come from the root files copied from that dir on dec15 - The ones with dec19 label come from the root files copied from that dir on dec19 * Notes from Dec 20, 2022 discussion with Furong: - Dec 15 numbers: * From last (dec 15) the WC ranges used for the 2d limits plugged into the combine command for the fit rests were from the ASIMOV 1d scans * The fit results were fits with real data * So these are not consistent (mix of asimov and real data) so we should not concentrate on these - December 19 numbers: * The 2 sigma limits correspond to limits from fits with real data * The fit results were with real data * So this is self consistent